Consultancy Projects - Department of Hydrology,Indian Institute of Technology Roorkee
Consultancy Projects

Ongoing

  1. Detailed Hydraulic and Hydrologic Study of Drains Near Vaishali Metro Station, PI: Dr. Ankit Agarwal, Client: GeoKnit Consultancy Services Private Limited

  2. Hydraulic Study for Remodelling of a Drain Section Near Proposed Sahibabad Station of Delhi-Meerut RRTS Corridor, PI: Dr. Ankit Agarwal, Client: GeoKnit Consultancy Services Private Limited

  3. Hydrogeological investigation of Pur village site for finding the causes of cracks in buildings PI: Dr. B.K. Yadav, Client:DM, Bhilwara, Rajasthan Government

  4. Reactive Transport Modelling for Discrete Fracture Network (DFN) in Porous Media ( 2017-2020 ), PI: Dr. B.K. Yadav, Client: CCTech, Pune
     
  5. Ground Water Coloration Problem of Shabajpur Area, PI: Dr. D.S. Arya, Client: Jubilant Organosys Limited, Gajrola
     

   

Completed

  1. Multi-scale investigation addons to intrinsic predictability of a time series. PI: Dr. Ankit Agarwal, Sponsor: Seed funding IIT Roorkee

  2. Hydrogeology study and groundwater quantification of Mirzapur Thermal Power Plant, UP, PI: Dr. B. K. Yadav
     
  3. Hydro-Geological Study of 10 km radius area of Mirzapur, UP ( 2018 ), Dr. B.K. Yadav, Client: Welspun Energy UP Pvt. Ltd.
     
  4. Geophysical investigation of 250 acre site in Sikar, Rajasthan and 150 acre site in Vrindavan UP ( 2017-2018 ), PI: Dr. B.K. Yadav, Client: DS Group, Noida
  5. Hydro-geological analysis of groundwater in and around Lalitpur thermal power plant ( 2017-2018 ), PI: Dr. B.K. Yadav, Client: Spatial Geotech Pvt. Ltd, Noida
     
  6. Groundwater coloration studies near Shabajpur village, Gajraula ( 2014-2017 ), Co-PI: Dr. B.K. Yadav, Client: Jubiliant Life Sciences Ltd
     
  7. Feasibility study for remediating hydrocarbon polluted sites ( 2016 ), Co-PI: Dr. B.K. Yadav, Client: Dr. Reddy’s Laboratory
     
  8.  Verifying Water Flow of P&G Baddi Plant ( 2018 ), Co-PI: Dr. B.K. Yadav, Client: P&G Plant Baddi
  9. Validation of Hydrology of Burthing and Phulibagar Small Hydro-Electric Projects (2017). Dr. D.S. Arya, Client: Essel Infra-projects Ltd., New Delhi

  10. Hydrogeological Monitoring and Analysis of Groundwater in and around Lalitpur Thermal Power Plant, (2017). Dr. D.S. Arya, Client: Spatial Geotech Pvt Ltd., Noida

  11. Validation of Hydrometeorological Data of SEW Sites, (2015). Dr. D.S. Arya, Client: SEW Energy Limited, Hyderabad

  12. Error Removal and Verification of Data of Rargari Site, (2011). Dr. D.S. Arya, Client: RK Engineering Corporation, Roorkee India

  13. Error Removal and Verification of Data of Tamak Lata Site - II (2012). Dr. D.S. Arya, Client: RK Engineering Corporation, Roorkee India

  14. Establishment of Institute of Hydrology and Water Management, Bikaner, (2012). Dr. D.S. Arya, Client: M/S Sapience Consultancy and Research Pvt. Limited, Hyderbad

  15. Review of Reports and Drawings of Dump Sites for Chenani Tunnel, J&K, (2011). Dr. D.S. Arya, Client: Leighton Contractors India Pvt. Ltd, Gurgaon, India

  16. Error Removal and Verification of Data of Rargari Site, (2011). Dr. D.S. Arya, Client: RK Engineering Corporation, Roorkee India

  17. Hydrological Assessment Report (for Nallahs at South Portal, North Portal & South Dump Site at Km 86) on NH 8, Jammu, (2011). Dr. D.S. Arya, Client: Leighton Contractors India Pvt.Ltd, Gurgaon, India

  18. Hydrological Study for Shamshabad Area, (2011). Dr. D.S. Arya, Client: GMR Hyderabad, India

  19. Error Removal and Verification of Data of Tamak-Lata and Langasu Sites, (2011). Dr. D.S. Arya, Client: RK Engineering Corporation, Roorkee India

  20. Snow Cover Studies in Nyukcharong Chu and Mago Chu Catchments, (2011). Dr. D.S. Arya, Client: SEW Energy Limited, Hyderabad

  21. GLOF Studies for Nyukcharong Chu and Mago Chu Hydro-electric Projects , (2010). Dr. D.S. Arya, Client: SEW Energy Limited, Hyderabad

  22. G&D Site Selection for Sirkari Bhoyal and Rupsia Bagar Hydro Project, (2010). Dr. D.S. Arya, Client: RK Engineering Corporation, Roorkee India

  23. Ground Water Study near Shabajpur and along Bagad River, 2010. Dr. D.S. Arya, Client: Jubilant Organosys Limited, Gajrola, India

  24. Velocity, Cross Section and Discharge Measurement on Chilla Power Channel, Rishikesh, 2009. Dr. D.S. Arya, Client: DLZ Corporation, Pune

  25. River Migration and Design Flood Studies for Barmer Salaya Pipe Line Project, 2009. Dr. D.S. Arya, Client: Larsen and Toubro Ltd., Faridabad, India

  26. Hydrological Survey and Investigation at Rajiv Gandhi International Airport, Shamshabad, 2009. Dr. D.S. Arya, Client: GMR Hyderabad, India

  27. Reconnaissance Survey Report of the Impact of Waste Disposal Practices on Ground Water along Bagad River, (2009). Dr. D.S. Arya, Client: Jubilant Organosys Limited, Gajrola

  28. Validation of Hydrology of Burthing and Phulibagar Small Hydro-Electric Projects, Dr. D.S. Arya, Client: Essel Infra-projects Ltd., New Delhi

  29.  Hydrogeological Monitoring and Analysis of Groundwater in and around Lalitpur Thermal Power Plant, (2017). Dr. D.S. Arya, Client: Spatial Geotech Pvt Ltd., Noida
  30. Study of Groundwater contamination around Daurala Industrial Complex, (2017-2018), Dr. Himanshu Joshi, Client: Sriram Industries

  31. Water availability study of river Damodar, (2010-2011), Dr. Himanshu Joshi, Client: Himachal EMTA Power Ltd. Kolkata

  32. Flood plain demarcation study, (2010-2011) , Dr. Himanshu Joshi, Client: Himachal EMTA Power Ltd., Kolkata

  33. Technical Evaluation of Sewage Tratment Plant at Meerut, 2007, Dr. Himanshu Joshi, Client: M/s Techno Eco consultants, New Delhi

  34. Technical Vetting of Tratment Plant at, 2007 , Dr. Himanshu Joshi, Client: M/s SMS Paryavaran Ltd., Delhi

  35. Assessment of Water supply related problems at Rampur 2003 , Dr. Himanshu Joshi, Client: M/s Xerox Modicorp, Rampur

  36. Water quality assessment in sugar industry recycle channel,Bijnor 2002 , Dr. Himanshu Joshi, Client: M/s Dwarikesh Sugar Mills

  37. Water quality program implementation under World bank aided Hydrology Project, Phase II, 1998 , Dr. Himanshu Joshi, Client: M/s DHV Consultants

  38. Water quality program implementation under World bank aided Hydrology Project, Phase I, 1997, Dr. Himanshu Joshi, Client: M/s DHV Consultants

  39. Rapid EIA studies for expansion of Titawi Sugar complex, Dist. Muzaffarnagar, 1995, Dr. Himanshu Joshi, Client: G.M., Titawi Sugar Mill

  40. River migration, design flood and scour depth studies in CAIRN BSPL pipeline project, Dr. M. K. Jain, Client: L & T Ltd., New Delhi

  41. Review of hydrological aspects of Tato-II & Siyom hydro-electric projects, Dr. M. K. Jain, Client: Reliance Energy Ltd., New Delhi

  42. Water Availability Study of River Damodar (West Bengal Stretch) at the intake point of the proposed 2X250 MW coal based thermal power plant of Himachal EMTA Power Ltd. at Raniganj, District – Burdwan, West Bengal, Dr. M. K. Jain, Client: Himachal EMTA LTD., Kolkata

  43. Study of Flood Plain Demarcation of the Selected site for setting up a 2X250 MW coal based thermal power plant of Himachal EMTA Power Ltd. at Raniganj, District – Burdwan, West Bengal, Dr. M. K. Jain, Client: Himachal EMTA Ltd., Kolkata

  44. Detailed hydrological study of Adityana limestone and marl mines of M/S Saurastra Cement Ltd, Dr. M. K. Jain, Client: Saurastra Cement Ltd., Ranavav, Gujarat.

  45.  Technical study (PMF, backwater and other hydrological studies) on Polavaram case matter, PI: Dr. M. Perumal
     
  46. Flood plain demarcation study of the selected site of the proposed 2*250 MW thermal power plant to be set up by the Himachal EMTA Power Ltd. at Raniganj, Dist. Bardhaman, West Bengal. Consultancy Report (January 2011), Dr. M. Perumal, Client: Himachal EMTA Power Ltd.
  47. Water Availability Study at the proposed Intake Pump House installation of the project on river Damodar for 2x250 MW power plant of Himachal EMTA Power Ltd. at Raniganj, Dist. Bardhaman, West Bengal. Consultancy Report (June 2010), Dr. M. Perumal, Client: Himachal EMTA Power Ltd.

  48. Review of Major Existing Real-Time Hydrological Forecasting Systems Integrated with SCADA - 4th February,2001., Dr. M. Perumal, Client: Slobodan P. SIMONOVIC Consulting Ltd., London, Ontario

  49. Ground water coloration studies near Shabajpur village (2013-14), Dr. N. K. Goel, Sponsor: Jubilant Life Sciences Limited, Gajraula

  50. Ground water and soil remediation measures near CTO-V, Hyderabad, 2014-15, Dr. N. K. Goel, Sponsor: Dr Reddy’s

  51. Review of reports and drawings of South dump site for Chenani- Nashri tunnel J&K, 2013-14, Dr. N. K. Goel, Sponsor: Leighton Contractors India Pvt. Ltd. and NHAI

  52. Review of reports and drawings of dump sites for Chenani- Nashri tunnel J&K, 2012-13, Dr. N. K. Goel, Sponsor: Leighton Contractors India Pvt. Ltd. and NHAI

  53. Hydrological Assessment for Chenani- Nashri tunnel area, 2011-12, Dr. N. K. Goel, Sponsor: Leighton Contractors India Pvt. Ltd. and NHAI

  54. Hydrological study near Shamsabad area by, 2010-11, Dr. N. K. Goel, Sponsor: GMR

  55. GLOF studies for two sub-basins in Twang basin, Arunachal Pradesh, 2011-13, Dr. N. K. Goel, Sponsor: SEW Infrastructure, Hyderabad

  56. Data validation for SEW project sites, 2011-12, Dr. N. K. Goel, Sponsor: SEW Infrastructure, Hyderabad

  57. Velocity and Cross Section Measurements of Chilla Canal, 2009-10., Dr. N. K. Goel, Sponsor: DLZ Power Pvt. Ltd., Pune

  58. Processing and verification of discharge data of river Tamaklata and Alaknada, 2009-10, Dr. N. K. Goel, Sponsor: R.K. Engineering, Roorkee

  59. Ground water coloration studies near Shabajpur village, 2010, Dr. N. K. Goel, Sponsor: Jubilant Organosys, Gajraula

  60. Ground water coloration studies near Shabajpur village, 2009, Dr. N. K. Goel, Sponsor: Jubilant Organosys, Gajraula

  61. Review of Hydrological Aspects of TATO – II and SIYOM HE-Project, 2008-09, Dr. N. K. Goel, Sponsor: Reliance

  62. Reconnaissance Study Around GHIAL, 2008-09, Dr. N. K. Goel, Sponsor: GMR

  63. River Migration Studies, Design Flood Studies, 2008-09, Dr. N. K. Goel, Sponsor: L&T

  64. Testing of pan Evaporimeters (1998), Dr. N. K. Goel, Sponsor: M/s Delite Engineering Works, Roorkee

  65. Hydrology study for integrated steel plant, Satarda (1997) contributed as member of study group, Dr. N. K. Goel, Sponsor: Usha Ispat Ltd.

  66. Validation Report on Hydrological and Water Quality Study of the Project sites of Rays Power Infra Pvt. Ltd. in Roorkee (Nov., 2017 - Dec., 2017), Co-PI: Dr. Sumit Sen, Sponsor: Rays Power Infra (P) Ltd., Jaipur

# # # # # | # # #
Credits : Information Management Group, IIT Roorkee
Copyright © , All Rights Reserved, Institute Computer Centre, IIT Roorkee.